Bibliographic description:
Borisov G. O.
,
Zdarov R. A.
ON THE EFFICIENCY OF CONSTRUCTING THERMAL POWER PLANT-2 IN ULAN-UDE // BSU bulletin. Economy and Management. - 2019. №4. . - С. 11-21.
Title:
ON THE EFFICIENCY OF CONSTRUCTING THERMAL POWER PLANT-2 IN ULAN-UDE
Financing:
Codes:
DOI: 10.18101/2304-4446-2019-4-11-21UDK: 338.45
Annotation:
The article analyzes the state of heat and power supply in Ulan-Ude. We have calculated pro- duction balance and consumption of thermal energy, actual and long-term balance plan of burning capacity and heat-flux density in TPP-1 and TPP-2; presented the data on the actual cost of production and transmission of thermal energy in Ulan-Ude for 2017. The article pre- sents the calculations of economic losses and identifies the reasons for the increased rates to consumers caused by the lag in construction of U-U TPP-2. We have considered the environ- mental state of Ulan-Ude by the level of air pollution. It has been revealed that for ten years the city has been included in the list of settlements with air alert level. Heat-only boiler sta- tions, TTP-1, TTP-2 and furnace devices of private house buildings are the main sources of pollution. It is shown that the commissioning of U-U TTP-2 will significantly reduce pollu- tion. A decision of the Russian Federation Government and inclusion of the project in the Na- tional Program of the Far East Development until 2025 and for the long term until 2035 are the measures necessary to complete the construction of Ulan-Ude TPP-2.
Keywords:
Ulan-Ude; TTP-2; heat-only boiler station; benzopyrene; heat and power supply; public utilities; electrical energy industry.